R&D of large-scale pipeline network equipment
07/11/2024Cooperate with large-scale cooling pipelines to conduct onshore scaled-down scientific research verification tests. The experimental contents include high heat flux density parallel multi-load branch two-phase heat exchange system, lightweight verification, multi-load different start-stop conditions test verification, multi-load variable power conditions verification, etc. It is mainly to verify the impact of high-power load start-stop, power adjustment and other conditions on the heat exchange efficiency of other branches in large-scale pipelines with centralized two-phase cooling. After the test is completed, the one-to-one pipeline network is used for a certain type of equipment. My team's load scaled-down test comparison scheme demonstration, heat exchange medium comparison selection, test machine production, test outline preparation, test responsibility, process report writing, project completion, value extraction (including papers and specialbenefits, etc.).