R&D of large-scale pipeline network equipment

Cooperate with large-scale cooling pipelines to conduct onshore scaled-down scientific research verification tests. The experimental contents include high heat flux density parallel multi-load branch two-phase heat exchange system, lightweight verification, multi-load different start-stop conditions test verification, multi-load variable power conditions verification, etc. It is mainly to verify the impact of high-power load start-stop, power adjustment and other conditions on the heat exchange efficiency of other branches in large-scale pipelines with centralized two-phase cooling. After the test is completed, the one-to-one pipeline network is used for a certain type of equipment. My team's load scaled-down test comparison scheme demonstration, heat exchange medium comparison selection, test machine production, test outline preparation, test responsibility, process report writing, project completion, value extraction (including papers and special benefits, etc.).